Planning by role

Allocate a stage to a role before you have picked a person, name a track lane for the work, and see the rates it prices from.

What you'll achieve

Plan a stage against a role and a named track before anyone is chosen, and read the billing and cost rates the role pins.

You'll end up with: A stage allocated to the Architect role, sorted into a named track lane, open and priced, with no person assigned yet.

This is step 1 of Staff the project. Real projects get planned before they get staffed. You know the Documentation stage needs an architect for a month and a half long before you know which architect it will be. Monument lets you plan that way: allocate the stage to a role now, sort the work into its own track lane, and leave the actual name for later.

We'll do it on Riverside Apartments: allocate the Architect role to the Documentation stage, name its track, and check the rates it prices from before anyone is assigned.

The idea: plan by role, then by name

Two ideas do the work here, and they are worth separating in your head.

A role is an allocation to a group of people, not a person. When you draw a band, Monument does not force you to name someone. Choose a role, like Architect, and the plan captures what kind of person the stage needs while the actual name stays open.

A track keeps a role's work in its own strand. Name the track when you create the allocation, so the work is sorted from the start rather than tidied up later. A busy schedule reads as clean, named lanes instead of one tangled block.

Put together, you can plan the shape of the work first and settle the name second. The role prices the plan immediately, using the role's own charge-out and cost rates, so nothing waits on a name to become real.

Allocate a stage to a role

You plan from the timeline, the same drag you would use to staff a stage. The difference is what you choose in the dialog that opens: a role, and no one else.

  1. 1

    Point at Schedules and choose Project schedule. Click the arrows beside Riverside Apartments and Documentation, so its resource lane appears.

  2. 2

    Drag across the Documentation resource lane to block out the work period. A dialog opens asking who it is for.

  3. 3

    Open Role and choose Architect, rather than a named person.

    Step 3
  4. 4

    Name the Track Architect Delivery, so this and future role work share one lane.

  5. 5

    Leave Assigned to on Unassigned, since this stage is planned as role capacity, not staffed work yet, and click Create.

Save it and read the rates

Save the allocation, then open it again to see what got recorded: the role, the track, and the rates the role contributes.

  1. 1

    Click Save to persist the allocation.

  2. 2

    Open it again. Role reads Architect, Track reads Architect Delivery, and Assigned to reads Unassigned.

  3. 3

    Under Charge and expense, the allocation prices from two hundred dollars an hour charged out and one hundred and fifty an hour in cost, the Architect role's rates.

    Step 3

Troubleshooting

  • The rate looks different from what you expect. A role's rate changes from a date and keeps its history, and a project can set its own rate for the role: check rates and rate history if the current amount surprises you.
  • Assigned to won't stay empty. Changing Role does not clear a selected person. Open Assigned to and choose the unassigned option while keeping Architect as the role.
  • You want this staffed now, not later. Assign a person directly instead of leaving Assigned to empty. When a name arrives after the plan, hand the role's work to staff.

Where this fits next

You'll know it worked when Documentation has Architect work with nobody assigned yet. Next, hand the role's work to staff to give a real person part of it while keeping the rest open and the rates intact.