Browse articles
- Getting started
- Project finances
- Billing by the hour
- Practice finances
- Grouping fees
- Budgeting project costs
- Claim an expense
- Recording revenue entries
- Recording project expenses
- Purchase orders
- Approving expenses
- Going further
- Construction cost fees
- Recurring fees
- Billing expenses
- Contingencies and discounts
- Billing progress claims
- Project templates
- Overheads
- Getting started
- Billing milestones
- Sending an invoice
- Billing logged time
- Month-end invoicing
- Fee proposal templates
- Writing a fee proposal
- Getting a proposal signed
- Link invoices that are already in Xero
- Going further
- Payments and overdue invoices
- Connect your accounting system
- Fee groups on invoices
- Tax codes and accounts
Billing logged time
Bill a task's logged hours as one Time line, then choose which hours bill, how the client reads them, and at what rate.
What you'll achieve
Turn a task's logged hours into a single, correctly grouped invoice line without touching anyone's timesheet.
You'll end up with: A draft invoice whose Time line bills exactly the right hours, grouped and priced the way you want the client to read them.
Before you start
A Time line is a lens on the timesheets, not a copy of them
If you bill time-based work, you rarely want every timesheet row dumped onto an invoice as-is. You want the hours that are actually billable, grouped the way this client expects to read them, at the rate you've agreed with them, and none of that should ever mean editing someone's timesheet. That's what a Time line does. It points at a task and shows the hours logged against that task, with filtering, grouping and pricing kept inside the line itself, not in the timesheets underneath it.
Sarah Chen has been logging hours against Client Workshops on Riverside Apartments, and none of it has been billed yet. This is the tutorial where those hours become an invoice line.
The line stays live until you approve
A Time line doesn't take a snapshot of the hours. While the invoice is a draft, the line keeps reading the timesheets through its filters, so if Sarah logs another hour on Client Workshops before you approve, the line picks it up.
Approving the invoice is what commits its hours. From then on, the hours it absorbed are locked on the timesheet side too: nobody can edit or delete a billed entry directly, override included. Issuing straight from a draft approves it first, so the hours lock at that point, not when the email delivers. Approving can also lock every other entry on the project up to the invoice's Bill until date. See Time entry locks and overrides for what to do if invoiced hours turn out to be wrong.
Read a line
Each line on the Lines step shows its Quantity and Unit price, and its Amount is the two multiplied. On a Time line the quantity is hours and the unit price is the hourly rate: Sarah's 2 hours at A$300 make A$600. On a Fixed amount line you type both straight into the row; on a Lumped Time or Expenses line, typing them is a line override (below).
Create the invoice with only the workshop hours
In Invoices, click New invoice and pick the project. Monument fills in the invoice with everything unbilled up to Bill until. Client Workshops has Sarah's hours, so Revenue from Allocations, its hours, arrives as a Time line. A fee on a stage with hours, such as the Concept Design Fixed Fee, arrives too, so delete its line when this invoice should bill time only. Time & expenses lists the hours the invoice bills.
- 1
In Invoices, click New invoice and pick Riverside Apartments in the Project dropdown. City of Hawthorn fills in as the client.
- 2
Open Lines. The Client Workshops Time line carries Sarah's unbilled hours, beside the Concept Design fee.
- 3
Click the arrow beside the Concept Design line and click Delete line, to bill only the workshops. The line goes at once; Undo in the bar at the bottom brings it back.

- 4
Click Create invoice. Monument creates the invoice as a draft and opens it, with a Time line for Client Workshops.
To bill another task's hours later, click Add line item in the invoice. Pick the task, tick Revenue from Allocations, and add the line.
Decide how the client reads it
Open Lines in the invoice and click the arrow beside the Client Workshops line. Its details open right under the line, with Group by and Sort dropdowns, the row description, and the Time entries and Rates buttons. Group by controls how much detail the client sees on this line.
- Lumped: every matching hour collapses into a single amount. The least detail.
- By role: one row per role.
- By person: one row per person, so Sarah Chen's hours show as their own row.
- By time entry: every time entry gets its own row. The most transparent, and the longest to read.
- 1
Open Lines and click the arrow beside the Client Workshops line, then open Line settings. A new line starts on By role.
- 2
Open Group by to see the four choices. Pick Lumped and Hours ร rate on this line appears: type the hours and rate the one row bills, without touching anyone's timesheet.
- 3
Set Group by to By person, so each person's time lands on its own row.

- 4
Adjust Sort if you want a different order, by date or by amount.
Moving from By time entry to Lumped changes only how coarse the breakdown looks. The hours underneath don't change. A long-standing retainer client is usually happy with Lumped, while a client that checks every line may want By time entry.
To label each row differently, pick another template in Rows read, under the line. The rows follow that template and update when someone edits it. To write your own wording for all rows, click the Edit description button beside it and choose Edit as text. To change one row only, click its text in the line table and type.
Choose exactly which hours bill
- 1
Click Show beside Time entries. Every candidate hour for Client Workshops opens as a row under it, with the total underneath: here, 2h with one entry included.

- 2
Read the filters above the entries. Date range takes every unbilled entry up to Bill until, and Billable only keeps internal time off the bill.
- 3
Open Resources and pick Sarah Chen. The line now bills only Sarah's hours, even if someone else logs time on Client Workshops before you approve. Groups narrows it to a team the same way.
- 4
Tick or untick individual entries. The total updates as soon as you change a selection.
- 5
Click Save to keep the grouping and the filter. The invoice stays a draft with these hours on it, ready to review and issue.
New Time lines start with Billable only on, so admin time and internal hours can't end up on a client's bill by accident. Turn it off only if the client has agreed to pay for something normally non-billable.
Override the price for this invoice only
Hours arrive at whatever rate they've already resolved to, but you're not stuck with that rate for this bill. Click Rates in the line's panel to set a one-off override that applies only here.
- Switch between By person and By role to see who or what is on this line.
- Click a row and type an override, for a concession you've agreed with this client on this invoice only.
- For a single unusual entry, set an entry override from the Time entries panel instead.
When more than one override could apply, Monument uses the most specific one: an entry override beats a person override, which beats a group override, which beats the default rate. Whatever you set here affects only this invoice; the rate cards and timesheets are untouched.
Edit a printed row's hours, rate or text
Each row a grouped or Lumped Time line prints can be edited in place: type new hours, pick or type a rate, or rewrite its text. This is a line override. It changes only what that row bills and prints, and it never touches the time entries under it. Clear the hours or the rate to go back to the worked-out value.
On a Lumped line, the row's hours are shared across its time entries in proportion to their own hours, so approving the invoice records billed hours that add up to the row. The row's rate bills every entry on the line, even an entry with its own override rate. Time entry overrides still apply first: the row starts from the hours and rates they give, and your line override sits on top.
Troubleshooting
- Time entries and Rates are unavailable. The line has no task. Choose the task the line bills, and the buttons turn on.
- "No time entries match this line's filters." The filters are too narrow. Widen the date range, clear the group or person filter, or check that Billable only isn't hiding hours you meant to bill.
- The total reads lower than expected. Something is excluded. Reopen Time entries and check what's ticked against what you expect.
- The Concept Design fee also landed on the invoice. Its line was not deleted before you clicked Create invoice. Open the line and click Delete line, then Save.
- An override doesn't seem to apply. An entry override on the same hours beats a person override every time. Clear the more specific one if it's masking your change.
Where this fits next
This is step 5 of Bill clients and get paid. This line exists only because hours were already logged against Client Workshops; to add or fix those first, see Logging time. Next, record payments and chase what is overdue.
Related articles
Search Monument help
Search help articles and open a result.